President Goodluck Jonathan on Friday
said he had fulfilled his campaign promise to Nigerians that he would
make the power sector his administration’s priority.
Jonathan stated this during the inauguration of the Olorunsogo II Power Station in Ogun State. The power plant is a 750MW Nigerian Integrated Power Project.
“I have lived up to my campaign pledge to make the power sector a priority,” Jonathan said.
He said although it was capital
intensive to make a difference in the power sector, his administration
had been addressing it headlong.
The President said the short interface between public ownership of power sector to private sector would soon be over.
According to him, Nigerians will begin to take power for granted in the next two years.
No comments:
Post a Comment
We reserve the right to delete any message found vulgarizing. Avoid crude or indecent texts..